Incheon Subway Line 1
Operating Section : Gyulhyeon-dong, Gyeyang-gu ~ Songdo-dong, Yeonsu-gu
Facilities
- Trackage : 29.4km (Total 31.2km)
- Stations : 29 (27 underground, 2 aboveground)
- Head office building : 1 (location of Total Traffic Control Center)
- Subway train depot : 1
Incheon Subway Line 2
Operating Section : Oryu-dong, Seo-gu ~ Unyeon-dong, Namdong-gu
Facilities
- Railroad length : 29.2km
- Number of stations : 27 (Underground, On the ground)
- Head office building : 1 (Location of the Traffic Control Center)
- Railroad depot : 1
Head Office Building
Location : 674, Gyeongin-ro, Namdong-gu, Incheon Metropolitan City
Site Area : 8,097㎡
Building Area : 2,496㎡
Overall Floor Area : 23,134㎡
Floors : 3 underground and 8 aboveground
Parking Capacity : 243 cars (underground floors 1~3)
Gulhyeon Depot
Location : 451, Gyulhyeon-dong, Gyeyang-gu, Incheon Metropolitan City
Site Area : 224,241㎡
Building Area : 44,212㎡
Gross Floor Area : 60,299㎡
Main Facilities : Administration building, main plant, inspection hanger, wheel grinding plant, rolling-stock wahing plant, etc.
UnYeon Vehicle Base
Location : 80, Unyeon-ro, Namdong-gu, Incheon Metropolitan City
Land area : 77,806㎡
Construction area : 13,869㎡
Total ground area : 15,248㎡
Parking space : For 162 Vehicles
Gulhyeon Depot
Location : 35, Yeonnam-ro, Nam-gu, Incheon Metropolitan City
Land area : 78,288.5㎡ (23,682.3 pyeong)
Building Area : 15,831.1㎡ (4,788.9 pyeong) ? the building-to-land ratio 26.78%
Total floor area : 161,677.4㎡ (48,907.4 pyeong)
Parking spaces : 2,179 (1,395 inside, 784 outside)
Boarding area : 17 (4 for express buses, 13 for intercity buses)